Industrial Mezzanines

If you need more space to accommodate workers at your facility without expanding your building as a whole, work platforms are a reliable, affordable option. Porta-King’s modular industrial mezzanines can be installed quickly and with minimal disruption to the workplace.

Industrial Mezzanines Add Space on a Budget

Since adding a work platform to your facility utilizes your unused ceiling space, you will have a safe second story where workers can do their job comfortably. Employees can use the platform for:

  • Additional space
  • Surveying the manufacturing floor
  • Accessing tall or suspended equipment

All of Porta-King’s modular industrial mezzanines are quick to construct and budget friendly, unlike traditional construction where it could take weeks to construct.

Industrial Mezzanine Video Gallery

Porta-King structural steel mezzanines are a cost efficient way to easily create additional space for storage or manufacturing by utilizing existing ceiling space inside new or existing buildings. Additional floor space is created by going up, not out, saving you the considerable cost of new construction. The prefabricated design also saves time since all components arrive prefabricated and ready for immediate installation.

Unlike many of our competitors, we’ll supply you with a truly prefabricated mezzanine system. All of our connecting hardware is pre-welded onto the structural components prior to shipping. Many of our competitors call their mezzanines prefabricated, but that just means the various components used to construct their mezzanines are prefabricated prior to shipping. Unlike a Porta-King mezzanine, this doesn’t always mean these components arrive welded to the structural components and ready to be mechanically fastened together.

This video demonstrates the speed in which our mezzanines can be installed. This 18′ wide by 48′ long mezzanine, including our single piece, sectional guard rail was completed by a two man crew in just 2 days.

Note the ease with which our 6′ wide sliding gate operates. Heavy-duty steel construction ensures years of trouble free service. Other mezzanine gate options are also available.

Increase Worker Safety

Our work platforms are designed and constructed to be as safe and in compliance with IBC codes. All work mezzanines are constructed with:

  • Guard railings to prevent accidental falls during day-to-day activities in the workplace.
  • Customized structure design to ensure the best fit in your facility and will be able to hold the weight of the maximum number of workers and their equipment safely.
  • Seismic integration to keep workers and the surrounding area safe during a seismic event, increasing safety.

Our professional team of designers will be more than happy to work with you to design a work platform for your facility and go over additional construction options for industrial mezzanines.

Frequently Asked Questions

What are the key height measurements for a mezzanine: top of deck height and clear height?

When planning for a mezzanine installation, two essential height measurements to consider are the top of deck height and the clear height. The top of deck height refers to the distance from the existing facility’s finished floor to the top surface of the mezzanine floor. This measurement is crucial for determining the overall height of the mezzanine and ensuring that it fits within the available vertical space. On the other hand, the clear height is the distance from the existing facility’s finished floor to the lowest point on the underside of the mezzanine structure. This measurement is important for understanding the usable space beneath the mezzanine and ensuring that it can accommodate any necessary equipment, storage, or personnel. By carefully considering both the top of deck height and clear height, you can ensure that your mezzanine installation maximizes the available space and meets your specific operational requirements.

What is the meaning of DLL (Design Live Load) in the context of mezzanines and towers?

DLL, or Design Live Load, is a critical factor in the engineering and construction of mezzanines and towers. It refers to the maximum weight, measured in pounds per square foot (psf), that the structure is designed to support safely. This load includes the weight of any equipment, materials, and personnel that will be present on the mezzanine or tower during normal use. The DLL is determined by the intended use of the structure and is a key consideration in the design process. By specifying the appropriate DLL, engineers can ensure that the mezzanine or tower is built to withstand the expected loads and maintain its structural integrity over time. When planning for a mezzanine or tower installation, it’s essential to accurately assess your load requirements and communicate them to your provider to ensure that the final structure meets your specific needs and safety standards.

What is the dead load of a mezzanine, and how does it differ from the Design Live Load?

The dead load of a mezzanine refers to the weight of the structure itself, measured in pounds per square foot (psf). This includes the weight of the structural components, such as the steel beams, columns, and decking, as well as any permanent fixtures or equipment that are integral to the mezzanine. The dead load is a constant value and does not change based on the usage of the mezzanine. In contrast, the Design Live Load (DLL) accounts for the weight of any additional items placed on the mezzanine, such as inventory, machinery, and personnel. The DLL is determined by the intended use of the mezzanine and can vary depending on the specific application. When designing a mezzanine, engineers must account for both the dead load and the DLL to ensure that the structure can safely support the total load without compromising its integrity. By understanding the difference between dead load and DLL, you can make informed decisions about your mezzanine installation and ensure that it meets your load-bearing requirements.

Why is the column base plate pressure an important consideration for mezzanine installations?

Column base plate pressure is a critical factor to consider when installing a mezzanine, as it determines the amount of load that will be transferred to the concrete foundation beneath the structure. The base plate pressure is calculated by dividing the total load on each column by the area of the base plate. If the resulting pressure exceeds the capacity of the existing concrete slab, it may be necessary to modify the foundation to ensure proper support for the mezzanine. This can involve cutting the existing concrete and pouring new footings to distribute the load more effectively. By assessing the column base plate pressure early in the planning process, you can identify any necessary foundation modifications and factor them into your project timeline and budget. Failing to address this crucial aspect of mezzanine installation can lead to structural issues and safety hazards down the line. Therefore, it’s essential to work with an experienced provider who can accurately calculate the base plate pressure and recommend the appropriate foundation solutions for your specific mezzanine installation.

How much welding is required during the installation of a mezzanine or tower?

One of the significant advantages of choosing a reputable mezzanine or tower provider is the potential to minimize or eliminate the need for on-site welding during the installation process. Many leading providers, like Porta-King, design their mezzanines and towers to be completely bolt-together constructions. This means that all the structural components are prefabricated and pre-drilled, allowing for a seamless assembly process that requires no welding. By eliminating the need for welding, you can significantly reduce the time and cost associated with installation. Welding requires specialized equipment, skilled labor, and additional safety precautions, all of which can add to the overall project expense. In contrast, a bolt-together system can be installed quickly and efficiently, often using only basic hand tools and a smaller crew. This not only saves hundreds of dollars in installation costs but also minimizes disruption to your facility and allows you to start using your new mezzanine or tower sooner. When evaluating potential mezzanine or tower providers, be sure to inquire about their installation process and whether they offer a bolt-together solution to maximize your savings and efficiency.

Product Literature

Mezzanine Product Sheet
Industrial Mezzanines

Case Studies

Mezzanine

A Vertical Solution for a Distribution Center in Need of Office Space

Porta-King Mezzanine

A Porta-King Mezzanine Adds Functional Space and Helps Create Jobs for the Automotive Industry

Porta-King Space Solutions

Porta-King Provides Space Solutions for State 48 Rock House

Mezzanine
Industrial Mezzanines

Design & Construction Options

Our mezzanine systems are designed to create highly functional space anywhere inside your facility. The pre-engineered components that we provide to construct our mezzanines are designed to be easy to install so your down time in the area of construction is dramatically reduced when compared to conventional construction. Porta-King Mezzanines are constructed of the highest quality american materials to provide the most durable structures that will provide years of trouble free service.