Porta-King modular inplant offices offer an easy way to quickly create a new, clean, and comfortable workspace inside your facility. Your material will be shipped in a crate with a clearly marked packing list attached to the outside. Inside the crate, you will find detailed installation instructions that include an illustrated parts list, floor plan layout, and a step-by-step assembly guide. Watch the video above for more information or call us today at (888) 481-1671.
Time-lapse of a Modular Install
This time-lapse video shows the delivery and installation of a Porta-King factory assembled modular building. With many design options available, these factory assembled modular buildings are easily customized to meet the unique performance requirements of each individual application. By constructing these modular buildings at our factory we virtually eliminate the need for any on-site labor.
As you can see in this video, the modular building is off-loaded from the delivery truck and quickly moved into position via a fork lift. Because the assembly process includes installation of electric all that will be necessary to complete this installation will be connection to the on-site power source. In addition to the speed of installation the portability of these buildings allows them to be quickly moved at anytime in the future.
Porta-King also manufactures modular buildings and wall systems for on-site assembly. These systems can also be assembled in a fraction of the time required for conventional construction. In addition, they can be taken down, moved and modified with a 100% recapture of the initial materials investment.
Time-lapse of a Modular Quality Control Lab Install
This Porta-King modular building will be used as a quality control lab for this printing company. The lab will be used to house a new color matching printing technique they use for a new product they are bringing to market. They needed a clean, temperature controlled environment, separate from the rest of their facility. They chose Porta-King modular construction because of the speed and ease of installation. Additionally, they knew that all of the materials used to create this new modular room arrive pre-cut and ready for installation. This meant no suspended dust or other debris that could interfere with the rest of their printing operation. This new modular room makes use of an existing wall for part of what would become the final structure. The entire project including installation of the acoustical ceiling system and all electrical wiring was completed in 3 days.